Crestron C2N-FTB Instalační příručka Strana 20

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 32
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 19
FlipTop Control Center, Dual AC Outlets Crestron C2N-FTB-D
NOTE: The maximum continuous current from equipment under any external load
conditions shall not exceed a current limit that is suitable for the minimum wire
gauge used in interconnecting cables. The ratings on the connecting unit's supply
input should be considered to prevent overloading the wiring.
NOTE: Ensure the unit is properly grounded.
Ground Wire Connections
Proper grounding is required. Connect the ground from the C2N-FTB-D to earth
ground. Connect the Cresnet shield lead at the control processor to the ground lead.
The control processor chassis must also be connected to an earth ground (building
steel). Refer to the following grounding diagram.
Ground Wire Connections
Shield
Ground Wire to
Earth Ground
Ground Wire to
Earth Ground
Cresnet
Control
Processor
C2N-FTB-D
24
Y
Z
G
NOTE: Do not connect the shield to earth ground at the C2N-FTB-D.
16 FlipTop Control Center, Dual AC Outlets: C2N-FTB-D Operations & Installation Guide – DOC. 6639B
Zobrazit stránku 19
1 2 ... 15 16 17 18 19 20 21 22 23 24 25 ... 31 32

Komentáře k této Příručce

Žádné komentáře